build 7bbbddf7 | content blog-content@c8490fa · 338 posts | profiles 20 · corpus 267 | 0 skipped | | format
apiVersion: soultec.ch/v1kind: Postmetadata: name: vmware-license-changes-2025 locale: en labels: author: yannick-gerber capability/strategy: 3.54 vendor/vmware: 0.88 annotations: source: blog-content/posts/en/vmware-license-changes-2025.md route: /en/insights/vmware-license-changes-2025/ schema: /nerd/schema/posts.json markdown: /en/insights/vmware-license-changes-2025.mdspec: title: VMware by Broadcom – License Changes date: 2025-04-01 author: yannick-gerber locale: en summary: >- There is a fair amount of misinformation going round about the VMware by Broadcom licence changes, particularly the 72-core minimum. Here is what is actually true. capabilities: [strategy] vendors: [vmware] hero: /blog-assets/vmware-license-changes-2025/hero.webp migrated: 2026-08-24 comments: 2 translationReviewed: false draft: false sections: - body: | There is a fair amount of misinformation going round about the VMware by Broadcom licence changes, particularly the 72-core minimum. Here is what is actually true. - heading:

The facts

body: | > **Update 07.04.2025** – The 72-core minimum order has been withdrawn. The minimum remains 16 cores. - The 72 cores are not per physical CPU (socket) - The 72 cores are not per host - The 72 cores do not apply to additional licences bought against a running contract - A minimum of 16 cores per socket still has to be ordered (except for the VCF Edge SKU, where 8 is the minimum) - The changes apply to vSphere Standard, Enterprise Plus, VVF and VCF The 72 cores are a minimum order for new contracts. Increasing or topping up licences on an existing contract is not affected by the 72-core minimum. Renewals do fall under it. For additional cores a co-term, so the same term for existing and additional licences, makes sense. - heading:

Renewals

body: | Late renewals carry a fee of +20%. That applies to migrations from perpetual to subscription-based licences as well. The changes take effect on 10 April 2025. - heading:

Examples

body: | Some worked examples for small environments with low-core CPUs. Not affected by the change: - 3 hosts, dual socket at 16 cores = 96 cores, so 96 cores have to be ordered (not 6×72=432) - 3 hosts, dual socket at 24 cores = 144 cores, so 144 cores have to be ordered (not 6×72=432) - 5 hosts, dual socket at 16 cores = 160 cores, so 160 cores have to be ordered Affected by the change: - 3 hosts, single socket at 16 cores = 48 cores, so 72 cores have to be ordered We do not see this as dramatic, because it only hits very small environments. What matters is that hardware sizing in environments this small is matched closely to the licensing: SKU, core count and term. If you have questions about the changes, we are here for you.status: corpus: 267 alsoLike: - {ref: posts/vcp5-dcv-exam-preparation-tips, score: 1.00} - {ref: services/digital-workplace, score: 0.74} - {ref: services/enterprise-architecture, score: 0.53}
{ "apiVersion": "soultec.ch/v1", "kind": "Post", "metadata": { "name": "vmware-license-changes-2025", "locale": "en", "labels": { "author": "yannick-gerber", "capability/strategy": "3.54", "vendor/vmware": "0.88" }, "annotations": { "source": "blog-content/posts/en/vmware-license-changes-2025.md", "route": "/en/insights/vmware-license-changes-2025/", "schema": "/nerd/schema/posts.json", "markdown": "/en/insights/vmware-license-changes-2025.md" } }, "spec": { "title": "VMware by Broadcom – License Changes", "date": "2025-04-01", "author": "yannick-gerber", "locale": "en", "summary": "There is a fair amount of misinformation going round about the VMware by Broadcom licence changes, particularly the 72-core minimum. Here is what is actually true.", "capabilities": [ "strategy" ], "vendors": [ "vmware" ], "hero": "/blog-assets/vmware-license-changes-2025/hero.webp", "migrated": "2026-08-24", "comments": 2, "translationReviewed": false, "draft": false }, "sections": [ { "body": "There is a fair amount of misinformation going round about the VMware by Broadcom licence changes, particularly the 72-core minimum. Here is what is actually true." }, { "heading": "

The facts

",
"body": "> **Update 07.04.2025** – The 72-core minimum order has been withdrawn. The minimum remains 16 cores.\n\n- The 72 cores are not per physical CPU (socket)\n- The 72 cores are not per host\n- The 72 cores do not apply to additional licences bought against a running contract\n- A minimum of 16 cores per socket still has to be ordered (except for the VCF Edge SKU, where 8 is the minimum)\n- The changes apply to vSphere Standard, Enterprise Plus, VVF and VCF\n\nThe 72 cores are a minimum order for new contracts. Increasing or topping up licences on an existing contract is not affected by the 72-core minimum. Renewals do fall under it. For additional cores a co-term, so the same term for existing and additional licences, makes sense." }, { "heading": "

Renewals

",
"body": "Late renewals carry a fee of +20%. That applies to migrations from perpetual to subscription-based licences as well.\n\nThe changes take effect on 10 April 2025." }, { "heading": "

Examples

",
"body": "Some worked examples for small environments with low-core CPUs.\n\nNot affected by the change:\n\n- 3 hosts, dual socket at 16 cores = 96 cores, so 96 cores have to be ordered (not 6×72=432)\n- 3 hosts, dual socket at 24 cores = 144 cores, so 144 cores have to be ordered (not 6×72=432)\n- 5 hosts, dual socket at 16 cores = 160 cores, so 160 cores have to be ordered\n\nAffected by the change:\n\n- 3 hosts, single socket at 16 cores = 48 cores, so 72 cores have to be ordered\n\nWe do not see this as dramatic, because it only hits very small environments. What matters is that hardware sizing in environments this small is matched closely to the licensing: SKU, core count and term.\n\nIf you have questions about the changes, we are here for you." } ], "status": { "corpus": 267, "alsoLike": [ { "ref": "posts/vcp5-dcv-exam-preparation-tips", "score": "1.00" }, { "ref": "services/digital-workplace", "score": "0.74" }, { "ref": "services/enterprise-architecture", "score": "0.53" } ] }}
apiVersion = "soultec.ch/v1"kind = "Post"[metadata]name = "vmware-license-changes-2025"locale = "en"[metadata.labels]author = "yannick-gerber""capability/strategy" = "3.54""vendor/vmware" = "0.88"[metadata.annotations]source = "blog-content/posts/en/vmware-license-changes-2025.md"route = "/en/insights/vmware-license-changes-2025/"schema = "/nerd/schema/posts.json"markdown = "/en/insights/vmware-license-changes-2025.md"[spec]title = "VMware by Broadcom – License Changes"date = 2025-04-01author = "yannick-gerber"locale = "en"summary = "There is a fair amount of misinformation going round about the VMware by Broadcom licence changes, particularly the 72-core minimum. Here is what is actually true."capabilities = ["strategy"]vendors = ["vmware"]hero = "/blog-assets/vmware-license-changes-2025/hero.webp"migrated = 2026-08-24comments = 2translationReviewed = falsedraft = false[[sections]]body = "There is a fair amount of misinformation going round about the VMware by Broadcom licence changes, particularly the 72-core minimum. Here is what is actually true."[[sections]]heading = "

The facts

"
body = '''> **Update 07.04.2025** – The 72-core minimum order has been withdrawn. The minimum remains 16 cores.- The 72 cores are not per physical CPU (socket)- The 72 cores are not per host- The 72 cores do not apply to additional licences bought against a running contract- A minimum of 16 cores per socket still has to be ordered (except for the VCF Edge SKU, where 8 is the minimum)- The changes apply to vSphere Standard, Enterprise Plus, VVF and VCFThe 72 cores are a minimum order for new contracts. Increasing or topping up licences on an existing contract is not affected by the 72-core minimum. Renewals do fall under it. For additional cores a co-term, so the same term for existing and additional licences, makes sense.'''[[sections]]heading = "

Renewals

"
body = '''Late renewals carry a fee of +20%. That applies to migrations from perpetual to subscription-based licences as well.The changes take effect on 10 April 2025.'''[[sections]]heading = "

Examples

"
body = '''Some worked examples for small environments with low-core CPUs.Not affected by the change:- 3 hosts, dual socket at 16 cores = 96 cores, so 96 cores have to be ordered (not 6×72=432)- 3 hosts, dual socket at 24 cores = 144 cores, so 144 cores have to be ordered (not 6×72=432)- 5 hosts, dual socket at 16 cores = 160 cores, so 160 cores have to be orderedAffected by the change:- 3 hosts, single socket at 16 cores = 48 cores, so 72 cores have to be orderedWe do not see this as dramatic, because it only hits very small environments. What matters is that hardware sizing in environments this small is matched closely to the licensing: SKU, core count and term.If you have questions about the changes, we are here for you.'''[status]corpus = 267[[status.alsoLike]]ref = "posts/vcp5-dcv-exam-preparation-tips"score = "1.00"[[status.alsoLike]]ref = "services/digital-workplace"score = "0.74"[[status.alsoLike]]ref = "services/enterprise-architecture"score = "0.53"
<?xml version="1.0" encoding="UTF-8"?><manifest kind="Post"> <apiVersion>soultec.ch/v1</apiVersion> <metadata> <name>vmware-license-changes-2025</name> <locale>en</locale> <labels> <author>yannick-gerber</author> <entry key="capability/strategy">3.54</entry> <entry key="vendor/vmware">0.88</entry> </labels> <annotations> <source>blog-content/posts/en/vmware-license-changes-2025.md</source> <route>/en/insights/vmware-license-changes-2025/</route> <schema>/nerd/schema/posts.json</schema> <markdown>/en/insights/vmware-license-changes-2025.md</markdown> </annotations> </metadata> <spec> <title>VMware by Broadcom – License Changes</title> <date>2025-04-01</date> <author>yannick-gerber</author> <locale>en</locale> <summary>There is a fair amount of misinformation going round about the VMware by Broadcom licence changes, particularly the 72-core minimum. Here is what is actually true.</summary> <capabilities> <item>strategy</item> </capabilities> <vendors> <item>vmware</item> </vendors> <hero>/blog-assets/vmware-license-changes-2025/hero.webp</hero> <migrated>2026-08-24</migrated> <comments>2</comments> <translationReviewed>false</translationReviewed> <draft>false</draft> </spec> <sections> <section> <body>There is a fair amount of misinformation going round about the VMware by Broadcom licence changes, particularly the 72-core minimum. Here is what is actually true.</body> </section> <section> <heading>

The facts

</heading>
<body>&gt; **Update 07.04.2025** – The 72-core minimum order has been withdrawn. The minimum remains 16 cores.- The 72 cores are not per physical CPU (socket)- The 72 cores are not per host- The 72 cores do not apply to additional licences bought against a running contract- A minimum of 16 cores per socket still has to be ordered (except for the VCF Edge SKU, where 8 is the minimum)- The changes apply to vSphere Standard, Enterprise Plus, VVF and VCFThe 72 cores are a minimum order for new contracts. Increasing or topping up licences on an existing contract is not affected by the 72-core minimum. Renewals do fall under it. For additional cores a co-term, so the same term for existing and additional licences, makes sense. </body> </section> <section> <heading>

Renewals

</heading>
<body>Late renewals carry a fee of +20%. That applies to migrations from perpetual to subscription-based licences as well.The changes take effect on 10 April 2025. </body> </section> <section> <heading>

Examples

</heading>
<body>Some worked examples for small environments with low-core CPUs.Not affected by the change:- 3 hosts, dual socket at 16 cores = 96 cores, so 96 cores have to be ordered (not 6×72=432)- 3 hosts, dual socket at 24 cores = 144 cores, so 144 cores have to be ordered (not 6×72=432)- 5 hosts, dual socket at 16 cores = 160 cores, so 160 cores have to be orderedAffected by the change:- 3 hosts, single socket at 16 cores = 48 cores, so 72 cores have to be orderedWe do not see this as dramatic, because it only hits very small environments. What matters is that hardware sizing in environments this small is matched closely to the licensing: SKU, core count and term.If you have questions about the changes, we are here for you. </body> </section> </sections> <status> <corpus>267</corpus> <alsoLike> <item> <ref>posts/vcp5-dcv-exam-preparation-tips</ref> <score>1.00</score> </item> <item> <ref>services/digital-workplace</ref> <score>0.74</score> </item> <item> <ref>services/enterprise-architecture</ref> <score>0.53</score> </item> </alsoLike> </status></manifest>
Post · 2025-04-01

VMware by Broadcom – License Changes

There is a fair amount of misinformation going round about the VMware by Broadcom licence changes, particularly the 72-core minimum. Here is what is actually true.

2025-04-01Date
Yannick GerberAuthor
2Min read
Topics Strategy 3.54
Vendors VMware 0.88

There is a fair amount of misinformation going round about the VMware by Broadcom licence changes, particularly the 72-core minimum. Here is what is actually true.

The facts

Update 07.04.2025 – The 72-core minimum order has been withdrawn. The minimum remains 16 cores.

  • The 72 cores are not per physical CPU (socket)
  • The 72 cores are not per host
  • The 72 cores do not apply to additional licences bought against a running contract
  • A minimum of 16 cores per socket still has to be ordered (except for the VCF Edge SKU, where 8 is the minimum)
  • The changes apply to vSphere Standard, Enterprise Plus, VVF and VCF

The 72 cores are a minimum order for new contracts. Increasing or topping up licences on an existing contract is not affected by the 72-core minimum. Renewals do fall under it. For additional cores a co-term, so the same term for existing and additional licences, makes sense.

Renewals

Late renewals carry a fee of +20%. That applies to migrations from perpetual to subscription-based licences as well.

The changes take effect on 10 April 2025.

Examples

Some worked examples for small environments with low-core CPUs.

Not affected by the change:

  • 3 hosts, dual socket at 16 cores = 96 cores, so 96 cores have to be ordered (not 6×72=432)
  • 3 hosts, dual socket at 24 cores = 144 cores, so 144 cores have to be ordered (not 6×72=432)
  • 5 hosts, dual socket at 16 cores = 160 cores, so 160 cores have to be ordered

Affected by the change:

  • 3 hosts, single socket at 16 cores = 48 cores, so 72 cores have to be ordered

We do not see this as dramatic, because it only hits very small environments. What matters is that hardware sizing in environments this small is matched closely to the licensing: SKU, core count and term.

If you have questions about the changes, we are here for you.

You might also like