title: Disaster Recovery
group: infrastructure
order: 7
tags: [backup-recovery, architecture, migration]
vendors: [hpe, veeam]
summary: RPO and RTO first, technology after. And a plan that has never been tested is a hope.
photoNeed: "A failover rehearsal in progress: two engineers at a screen with a runbook open beside them, mid-test rather than posed"
stub: false
draft: false
---

## What it protects against

Power failure, water, fire and earthquake, all rare and all possible. And ransomware, where
a properly thought-through disaster recovery plan is the difference between days and weeks.

## Where we start

With two numbers. **RPO**, how much data loss is acceptable, and **RTO**, how long it may
take to be running again. Both have to be verified and signed off with the stakeholders,
because they carry the whole architecture and are not a technical quantity.

After that we classify and prioritise data and systems. Not everything needs the same
number, and trying to treat everything alike is the most common reason a plan becomes
unaffordable.

## How the design comes together

It accounts for the workloads in your datacentres and in your public clouds, along with
availability and performance requirements. Site choice feeds in too: where your datacentres
and cloud regions sit partly determines what is possible at all.

## Implementation, and the part that gets skipped

We build on Zerto and Veeam. Both allow the real event to be rehearsed: virtual servers can
be started in a sandbox at the recovery site and checked without touching production.

That is exactly the part that gets skipped. Regular test scenarios with the system
administrators and the affected departments are what separate a plan from a hope.